65. Within 30 days after the day on which the testing required by section 63 was performed, the operator must provide the Minister with a report in writing containing the following information:(1) the flow measurement method used for the testing;
(2) the difference in percentage between the measurement of the primary element and the flow measurement obtained during the testing; and
(3) the results and the steps enabling the flow value to be obtained on testing.